How Long Does a Bathroom Refit Take? A Day by Day Guide

Advice from AJE Property Maintenance, based in Hedge End and working across Southampton.

If you only have one bathroom, the first question isn’t usually about tiles or taps. It’s how long you’ll be without a shower, and whether you’ll have a working toilet at night. Nobody wants a job that was meant to take a week dragging into a third.

This guide breaks a typical refit down day by day, explains what causes delays, and gives you some practical ways to cope while the room is out of action. If you’re planning a bathroom refurbishment in Hedge End, Southampton or nearby, it’ll help you plan the dates around work, school and family.

How Long a Typical Bathroom Refit Takes

Most standard family bathrooms take around 5 to 10 working days from strip out to final clean. A like-for-like swap in a small en suite, with no tiling changes, can be done in 3 to 5 days.

Bigger jobs take longer. Moving the toilet or bath, converting to a wet room or fixing a damaged floor can push a refit to 10 to 15 working days or more. The same things that drive what a bathroom refit costs also drive the timescale.

A Day by Day Breakdown

Every bathroom is different, but a standard refit with full tiling often runs something like this:

  1. Day 1, strip out. The old suite, tiles and flooring come out, the water is isolated and the waste is taken away.
  2. Day 2, first fix. Pipework and wastes are moved or renewed for the new layout. Any wiring for lights, a shaver point or an extractor fan is run now.
  3. Day 3, boarding and waterproofing. Walls and floors are boarded, and the shower area is waterproofed so water can’t reach the boards behind the tiles.
  4. Days 4 to 6, tiling. Walls first, then the floor. Adhesive needs time to set before grouting, and grout needs time to cure before the room gets wet.
  5. Day 7, second fix. The toilet, basin, bath or shower, taps, screen and accessories go in, and everything is tested for leaks.
  6. Day 8, finishing. Silicone sealing, decorating, a full clean and a walk round with you.

Grout and silicone usually need 24 hours or more before you use the shower, and some products ask for longer in a cold or damp room.

What Causes Delays

These are the usual reasons a refit runs over:

  • Late materials. A tray, vanity unit or tile on back order can stop the job halfway. Lead times on some fittings run to several weeks.
  • Hidden problems. Rotten floorboards, a leaking waste or loose plaster only show once the old tiles are off, and they have to be fixed properly first.
  • Changes mid-job. Moving the toilet or switching from a bath to a shower after first fix means redoing pipework.
  • Drying and curing time. Waterproofing, adhesive, grout and plaster all need time, and rushing them causes leaks and cracked grout later.
  • Electrical work. Most new electrical work near a bath or shower is notifiable under Part P of the Building Regulations, so the electrician’s visit has to fit the schedule.

Living Without a Bathroom During the Work

If it’s your only bathroom, plan for a few days without a shower and possibly a night or two without a toilet. Ask your fitter on the quote which days the toilet will be out of use, and whether it can be reconnected at the end of each day.

Some practical things that help:

  • Find somewhere to shower. A gym, a relative nearby or a workplace shower covers the worst of it.
  • Book time away for tiling days. That’s usually when the room is least usable and the house is dustiest.
  • Clear the route. Moving things off the landing and stairs makes the strip out faster and cleaner.

How to Keep Your Refit on Schedule

The biggest thing you control is decisions. Pick your suite, tiles, taps and lighting before the start date, and have everything delivered and checked for damage before day one.

If you’re still deciding between a walk-in shower or a bath, settle it at the quote stage. Changing your mind once the pipework is in is the most common way a one week job turns into two.

How AJE Property Maintenance Can Help

At AJE Property Maintenance we plan the order of work before we start:

  • A free survey and written quote. We see the room, talk through what you want and put the price in writing.
  • Each stage set out. Your quote lists what’s included, from strip out to final clean, so you can plan the weeks around it.
  • Tidy work. Floors and stairs are protected and the old suite and tiles are taken away.
  • Insured. We carry insurance for the work we do in your home.

Want to Know How Long Your Bathroom Will Take?

Book a free survey and we’ll give you a written price and an idea of how many days the job will take.

Call 07752 629617 or use the quote form and we’ll come back to you.

Written by Alan, AJE Property Maintenance, based in Hedge End and working across Southampton and Hampshire.

Need help with bathroom refurbishments?

Full bathroom refits and makeovers, from strip out to the final tile, handled by one team. See our bathroom refurbishments service or ask for a free quote.

FREE QUOTES

Get your free quote

Tell us about the job and we’ll come back with a clear, no obligation price.

Prefer to talk? Call 07752 629617. Photos of the job help us quote faster, just mention you have some and we’ll ask for them.

AJE Quote Form
Call 07752 629617Call Now